BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//CiviCRM//NONSGML CiviEvent iCal//EN
X-WR-TIMEZONE:Europe/London
METHOD:PUBLISH
BEGIN:VTIMEZONE
TZID:Europe/London
BEGIN:STANDARD
TZOFFSETFROM:+0000
TZOFFSETTO:+0000
TZNAME:GMT
DTSTART:20261202T120000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
UID:CiviCRM_EventID_625_8c6b5e08f55b867b2f101dd124c76d83@pipeguild.com
SUMMARY:WEBINAR - OMAN:  LNG Train 1 & Train 2 Outfall Rep
 lacement Project.
X-ALT-DESC;FMTTYPE=text/html:<!DOCTYPE HTML PUBLIC
  "-//W3C//DTD HTML 3.2//EN"><html><body><p> </p>\n
  \n <p><span style="font-size:14px\;"><span style=
 "font-family:Arial\, Helvetica\, sans-serif\;">Oma
 n LNG’s liquefaction plant is located at Qalhat\, 
 near Sur in Oman. The existing shared offshore coo
 ling-water outfall system serving Trains 1 and 2 w
 as damaged beyond repair. </span></span></p>\n \n 
 <p><span style="font-size:14px\;"><span style="fon
 t-family:Arial\, Helvetica\, sans-serif\;">The pro
 posed replacement comprised two independent outfal
 l systems\, each with a new weir box and an approx
 imately 650 m pipeline discharging through an offs
 hore diffuser configuration.<br />\n Following app
 ointment of a new marine contractor\, high marine 
 construction costs and risks associated with dredg
 ing uncertain ground and anticipated hard rock pro
 mpted Oman LNG to commission Haskoning to explore 
 alternative designs and construction methods. The 
 new design considered reduced dredging and pipelin
 e lengths\, alternative pipeline protection and us
 e of existing rock bunds with the aim of improving
  constructability\, safety\, technical integrity\,
  cost and schedule.</span></span></p>\n \n <p><spa
 n style="font-size:14px\;"><span style="font-famil
 y:Arial\, Helvetica\, sans-serif\;">We are delight
 ed to welcome presenters</span></span></p>\n \n <p
 ><span style="font-size:14px\;"><span style="font-
 family:Arial\, Helvetica\, sans-serif\;">Wasim Has
 him - Director Intakes\, Outfalls and Marine Pipel
 ines - Haskoning<br />\n Daniel Akpan - Senior Mar
 ine Pipelines Engineer<br />\n Naveed Iqbal - Mari
 ne Pipeline Engineer</span></span><br />\n  </p>\n
  \n <p><br />\n  </p></body></html>
DESCRIPTION: \n \n \n \n Oman LNG’s liquefaction plant is loca
 ted at Qalhat\, near Sur in Oman. The existing sha
 red offshore cooling-water outfall system serving 
 Trains 1 and 2 was damaged beyond repair. \n \n \n
  \n The proposed replacement comprised two indepen
 dent outfall systems\, each with a new weir box an
 d an approximately 650 m pipeline discharging thro
 ugh an offshore diffuser configuration.\n \n Follo
 wing appointment of a new marine contractor\, high
  marine construction costs and risks associated wi
 th dredging uncertain ground and anticipated hard 
 rock prompted Oman LNG to commission Haskoning to 
 explore alternative designs and construction metho
 ds. The new design considered reduced dredging and
  pipeline lengths\, alternative pipeline protectio
 n and use of existing rock bunds with the aim of i
 mproving constructability\, safety\, technical int
 egrity\, cost and schedule.\n \n \n \n We are deli
 ghted to welcome presenters\n \n \n \n Wasim Hashi
 m - Director Intakes\, Outfalls and Marine Pipelin
 es - Haskoning\n \n Daniel Akpan - Senior Marine P
 ipelines Engineer\n \n Naveed Iqbal - Marine Pipel
 ine Engineer\n \n  \n \n \n \n \n \n  \n \n 
CATEGORIES:Webinar
CALSCALE:GREGORIAN
DTSTAMP;TZID=Europe/London:20261202T120000
DTSTART;TZID=Europe/London:20261202T120000
DTEND;TZID=Europe/London:20261202T130000
URL:https://pipeguild.com/civicrm/event/info?reset=1&id=625
END:VEVENT
END:VCALENDAR
