Leaktight double block and bleed solution of a high pressure C02 pipeline

Join Skype Meeting

STATS Group provided hot tapping and plugging operations at five locations on a 30” Carbon Dioxide pipeline operating at 153 bar. The project facilitated safe installation of valves and pigging launchers/receivers into a previously unpiggable pipeline, while production was maintained through a 24” temporary bypass. Safely isolating high pressure C02 poses many challenges. To overcome these extensive testing, appropriate material selection and verification trials were conducted.

Join Skype Meeting

If you do not have audio on your laptop then join by voice on +44 203 443 9992 and enter code 6275321#

When
March 2nd, 2020 12:00 PM   to   12:30 PM

Help spread the word

Please help us and let your friends, colleagues and followers know about our page: Webinar - Darren Pledger and Neil Mackay - STATS


You can also share the below link in an email or on your website.
https://pipeguild.com/civicrm/event/info?id=56&reset=1