Site Visit to SPA Directional Drilling OD560 SDR11 PE Pipe

 Registration is closed for this event
The Eastern branch have organised a site visit to see the Directional Drilling (HDD) of a 210m long OD560 PE100 SDR11 pipe for the Strategic Pipeline Alliance SPA, near Ely at the Southery site location on Thursday 25 January 2024.


Site visit to see the Directional Drilling (HDD) of a 210m long OD560 PE100 SDR11 pipe for the Strategic Pipeline Alliance SPA


Meet at 9am at Southery Site Compound for mandatory site induction


W3W: ///galloped.assures.losing


PPE is required
• Hi-viz jacket/vest and trousers (preferably orange)
• Steel toe and mid sole boots
• Eye protection
• Hardhat
• Gloves

Please note, priority will be given to those who are members of The Pipeline Industries Guild.

When
January 25th, 2024 9:00 AM   to   12:00 PM
Location
FELTWELL ROAD COMPOUND
FELTWELL ROAD
SOUTHERY, PE38 0PE
United Kingdom