Webinar - Darren Pledger and Neil Mackay - STATS

Leaktight double block and bleed solution of a high pressure C02 pipeline

Join Skype Meeting

STATS Group provided hot tapping and plugging operations at five locations on a 30” Carbon Dioxide pipeline operating at 153 bar. The project facilitated safe installation of valves and pigging launchers/receivers into a previously unpiggable pipeline, while production was maintained through a 24” temporary bypass. Safely isolating high pressure C02 poses many challenges. To overcome these extensive testing, appropriate material selection and verification trials were conducted.