Webinar: River Dee HDD Crossings
Join OCU Group, HDD Design Manager, Ross Henderson for a webinar on the design and installation complexities of the award-winning River Dee Tunnel Replacement Pipelines.
Ross Henderson, HDD Design Manager at OCU Group, will present on the design and installation by Horizontal Directional Drilling, (HDD), of twin 800m long by 355mm diameter Barrier Pipelines beneath the River Dee estuary, for Dŵr Cymru Welsh Water.
These pipelines were installed in both an environmentally sensitive and heavily contaminated area.
The scheme won the 2023 Pipeline Industries Guild “Utility Pipeline Project” Award.
When
December 5th, 2023 from 12:00 PM to 1:00 PM